Nowadays, more and more people invest in aerated block equipment. How to improve the efficiency of the aerated block equipment production line is a problem we care about. The following is a summary for you:
1. The overall layout of the plant of the aerated block equipment product factory should be based on the production scale, process flow, source of raw materials, water source, power source, heat source, traffic, climate conditions, topographic characteristics of the plant area, engineering and hydrogeological conditions, as well as the main production workshop and auxiliary production Depending on the relationship between the workshop and public welfare facilities. There are two types of layout and decentralized layout. Only several types of layout are adopted, that is, several types of main production sections are in a joint workshop, and each process layout example is centralized layout.
2. The plant layout of the aerated block equipment product factory should consider the rationality of the technological process, and strive to be simple, compact, small in area, convenient to transport, and leave room for expansion. The layout of the column grid should meet the requirements of the building modular system as much as possible.
3. The vertical layout of the factory building of the aerated block equipment product factory is multi-layer or single-layer, which is mainly determined according to the process characteristics. The height of each floor is mainly determined by the height of equipment, maintenance and installation requirements, and meets the requirements of lighting and ventilation, but the minimum floor height should not be less than 2.5m. The determination of storey height should also meet the requirements of the building modular system.
4. Pay attention to the intermediate silos and storage yards of raw materials, semi-finished products and finished products to ensure good transportation.
5. According to the corresponding safety technology and environmental protection requirements, we will also carry out reasonable intervals for certain aerated block equipment units in the workshop. Such as preventing the ball mill crusher from noise, dust, moisture, corrosion, and vibration of the lime.
6. Pay attention to the pouring and pre-cultivation cutting process. During the design, various parts can be arranged according to the determined process flow and the main equipment of the aerated block equipment, and then the other parts can be reasonably connected with the main process as the center. In the workshop process layout drawing, it is generally drawn in the form of a schematic diagram, and the size of the process room, the equipment room, and the equipment and building structure are indicated.
7. To ensure that the workshop process is smooth. Strive to avoid backflow and crossover phenomena in the movement of raw materials and semi-finished products. Minimize the transportation distance of raw materials and semi-finished products to make the workshop layout compact. Ensure that the aerated block equipment has enough operating space.