The main points of the operation of the gas block equipment

Feb 02, 2024


Some preparations before booting the gas block equipment:

1. Check whether the screws of each component are tight, and clean up the tools such as the middle box, the tools in the mold holes, and the tools on each movement.

2. Inject lubricating oil in the oil cup.

3. Check whether there is any failure of the electrical appliance.

4. Check whether the depth of feeding in the mold hole is appropriate, and check whether the upper head and downward pressure depth are appropriate.

5. Check whether there is a gap between the crusher block and the four corners of the lower head.

6. Check whether the tightening of the triangular belt is suitable, whether the large and small belt wheels are right, and whether the large and small belt wheel shaft is parallel.

When the air supply block equipment is shut down, a series of preparations must be done:

1. Discriminate when working normally, the supply should be stopped first.

2. When the ingredients are suppressed, the motion of the mission of the bricks should be turned off when the ingredients are all pressed.

3. After the downturn, the ingredients sticking to the lining in the mold hole, the ingredients of the feeding and fighting fight and the excess material in the feeding fight should be cleaned.