Introduction to the production process process of replenishing concrete equipment

Nov 10, 2023

 

The production process of pneumatic concrete equipment has become more automated. At present, the gas -added concrete equipment has achieved automation control. The integration of mechanical and electromechanical integration has improved production efficiency and improved the life and use of gas -added concrete equipment. Realize business flexibility and easy -to -use production technology. The various complex processes controlled by the production line by the computer to ensure the production quality of the product. Here are a detailed introduction to the process process of pneumatic concrete equipment:

1. The raw material preparation system for gas -added concrete equipment:

First add the raw materials such as sand or flour ash into the hopper, then transport it to the grinding of the grinding machine by measuring, then enter the ball mill, enter the slurry pool, and then transport the slurry pump to the slurry irrigation. Among them, the slurry irrigation is divided into three plasma irrigation and two waste slurry irrigation.

2. Lime treatment system:

Add lime to the lime bucket for crushing, and then increase the lime to the granular limem in the granular lime warehouse through the bucket improvement machine. The entire process is equipped with a dust removal system. The lime grinds to the 200 mesh through the ball mill, and then stores in the limestone.

Third, pnealing concrete equipment reinforced mesh preparation system:

The reinforcement is processed, cut, welded, and welded through the automatic mesh welding machine. After the welding is completed, the steel bars need to be stored after anticorrosive drying. After the completion, the net cage and steel cymbal need to be organized and cleaned up to assemble the net cage. Modern frames are inserted.

Fourth, the ingredient pouring system of gas -added concrete equipment:

After the measuring material ratio is fully mixed under the mixing of the pouring blender, the foam combing machine is descended to the mold box through the foam combing machine. The cooked mold box is transported to the inserting position by the mixed car to the passing wheel, and the net cage is prepared for insertion, and then entering the quiet room for a restraint.

Fifth, quiet, flip, cutting system:

Enter the quiet room for static care. The body completes the quiet care through the process of exhausting, first condensation, and hardening. When the plate is produced, the body is pulled out after the body is out of the static room. The mold box returns the next round of oil and pouring. First of all, the crushing knife, thick knife, and fine knife in the side cutting machine are cut on the side of the blank body. At the same time, processing the plates, accurately cut the thickness of the board or block through the horizontal cutting machine, Perform vertical cutting, and prepare steaming after cutting.

6. Incorporate concrete equipment into the kettle and pre -nourishment system of kettle:

After the cut, the body enters the quiet room for quiet nourishment and wait for the kettle.

Seven, pneumatic concrete equipment out of kettle, finished finishing packaging system:

After completing the steam, exhaust the steam kettle, and then pull the body that is completed by the steaming, transmitted from the traction machine to the division position for division. After the division is completed Essence During all production process, the waste will be recovered and cleaned through the waste recycling system, and the baked body is completed by dual -mold fixture, and the automatic packing machine is packaged. Put the area reasonably.